Notable Projects

Martam Construction
Project: Raymond St. Forest Preserve Bike Bath & Pedestrian Tunnel
Location: Elgin IL
Description of Work: Pressure grouting pretreatment of soils in preparation for the installation of a 12’ diameter pedestrian tunnel beneath Union Pacific railroad track. MasterRoc MP 650 Microfine Cement used to immobilize soils.

IHC Construction
Project: Lockport Lock and Dam Powerhouse, Corps of Engineers/Greater Water Reclamation District of Chicago
Location: Lockport IL
Description of Work: Des Plaines River coffer dam bedrock floor leaking 1,200 GPM water cutoff. Terrathane 24-070 used to perform water cut-off.

Weston Solutions
Project: Former Rare Earth Facility Superfund Site Remediation Project
Location: West Chicago, IL
Description of Work: Cutoff wall grouting for the purpose of uranium containment. MasterRoc MP 650 Microfine Cement and Strata-tech ST-504 gel solution grout used to perform sealing.

Eastlake Management
Project: United States Social Security Administration Office
Location: Chicago, IL
Description of Work: Soil densification, concrete raising, and void filling. Terrathane 24-070 and 24-003 were used on this project.

De James Builders, Inc
Project: Walgreens – US Flag Ship Store
Location: Chicago, IL
Description of Work: Soil densification using high-density polyurethane to stabilize urban fill. Terrathane 24-030 was used on this project.

Four Points RV Resorts
Project: Earthen Dam Grouting Pine Lakes RV Resort
Location: Pittsfield, IL
Description of Work: Compaction grouting to provide soil improvement to inhibit soil erosion from water migration, void filing, and create water cut off. Terrathane 24-003 was used on this project.

L.J. Keefe – Commonwealth Eddision
Project: Utility Connection Pit Water Cut-Off
Location: Vernon Hills, IL
Description of Work: Compaction grouting and void filling to provide soil improvement by displacement to sufficiently inhibit soil erosion, fill underlying voids, seal sheet pile joints, and create water cut off. Terrathane 24-003 and 24-039 were used on this project.

JayDee Contractors Inc.
Project: O’Hare Airport Utility Connection Pit Water Cut-Off
Location: O’Hare Airport, IL
Description of Work: Compaction grouting to provide soil improvement, water cut off for fifteen foot diameter tunnel connections beneath airport runways. Terrathane 24-003 was used on this project.

Thatcher Foundations Inc.
Project: Northwestern University Ryan Field Football Stadium
Location Evanston, IL
Description of Work: Soil stabilization around soil nails and sheeting to prevent soil loss and leaching water. Terrathane 24-039 was used on this project.

Pearce Services & AT&T
Project: Communication Vault Water Cut-Off
Location Los Angeles, CA
Description of Work: Permeation grouting to inhibit water infiltration into telecommunications vault. Strata-tech ST-504 was used on this project.

Thatcher Foundations, Inc.
Project: MGNWC Nagle Avenue Pump Station
Location Morton Grove, IL
Description of Work: Trench grouting water cutoff around twin 48" diameter water lines. Granular bedding materials below grade and adjacent to the pipelines was pumped to fill voids using a high density , rapidly expanding geo polymer foam.

American Trenchless Technologies
Project: For Pipeline Alignment
Location Chicago, IL
Description of Work: Restaurant 6’’ sanitary line broke 7 feet below-grade in front of the building located under a sidewalk near several utility lines and a traffic signal. Lincoln performed soil extraction to lower the pipe section back into alignment for re-lining without excavation. Lincoln’s patented Soil Extraction Device was used on this project.